
1 FT
Custom concrete pools · East Valley
Know every week between the dig and your first swim.
We design and build custom concrete pools, with the schedule, the price of every stage and your part in it agreed before we dig.
Fixed price, signed before we dig
Pay only for finished stages
One project lead, dig day to handover
Plan backwards from your first swim
Free · 20 sec
Move across the waterTouch the water
3 FT — The build, in the open
Pick a month. We’ll show you the build backwards.
Every stage, when it starts, what it costs and what you need to do. Tap a stage to see it. These are our typical timings; we confirm yours after a site visit.

5 FT — Recent pools
Finished pools, and how long each one took.
Every project shows its size, depth and the weeks from dig day to handover. The numbers are part of the story.
6 FT — What you pay, and when
You never pay ahead of the work.
Your contract splits the price into six payments. Each one is due when a stage is finished and you’ve seen it, never before.
7 FT — In writing, before we dig
Three things you get on paper before the excavator arrives.
No verbal estimates. The price, the schedule and the person you’ll call are agreed and signed before a shovel goes in.
Saltbrook Pools · Build agreement
Page 1 of 1
§1
A fixed price
Signed before we dig. If we hit rock, caliche or a buried pipe, that’s ours to absorb, and the contract says so.
§2
A written schedule
Every stage with a start week, built from your swim month. You get a photo and a note every Friday.
§3
One project lead
The same person from the first site visit to pool school. One number to call, not a dispatch line.
8 FT — Before you call
The questions every homeowner asks us first.
Something else on your mind? Ask it on the visit form and we’ll answer before we come out.
Most of our concrete pools take 12 to 16 weeks from design approval to handover. Permits are the part we control least, so we start them the week you approve the design.
A 10% deposit when you approve the design, then five payments, each due only after a stage is finished and you’ve seen it. Nothing is ever due ahead of the work.
We tell you the same day and send a revised schedule. Weather days move the dates, not the price.
If you have an HOA, yes. We prepare the drawings and the packet, and you sign and submit it. Most come back within two to three weeks.
Nothing. It takes about 45 minutes. We measure, check access for the excavator and leave with enough to draw your pool and price it.


